Choosing a battery energy storage supplier for a commercial and industrial project is a long-term decision: the system will cycle every day for many years, interact with the site's grid connection and solar array, and support the business's energy cost and sustainability goals. The strongest choice is a supplier that combines its own manufacturing, proven battery technology, in-house control software, documented project experience and dependable service. These are the five capabilities MPMC brings to every HBD project.
Capability 1: In-House Manufacturing
MPMC Energy Tech in Yangzhong, Jiangsu, opened in January 2025 with USD 27 million of investment, a 19,000 m² workshop and a 3,300 m² R&D centre. It runs a semi-automatic and a fully automatic battery pack assembly line together with fully automatic BESS and hybrid assembly lines, giving C&I customers consistent quality and capacity for projects from a single cabinet to multi-megawatt-hour plants. MPMC itself was founded in 2008 and was the first Chinese diesel generator set manufacturer listed on the NEEQ (stock code 832266).
Its sister factory, MPMC Powertech Jiangsu in Haimen, adds a 22,000 m² smart factory with a CNAS-accredited testing centre and smart factory systems covering CRM, ERP, PLM, MES and OA, supporting the same disciplined production for MPMC's generator set range.
MPMC HBD-A Series HBD-500-1000 containerised battery energy storage system, delivering 500 kW from 1,045 kWh.
Capability 2: Proven Battery Technology
HBD-A systems use LFP 314Ah cells rated for 8,000 cycles at 90% depth of discharge, liquid cooling on every model, IP67 battery packs within an IP54 system, CE-certified aerosol fire protection and C4 anti-corrosion coating. The series covers 125 kW to 1,125 kW and 261 kWh to 2,170 kWh per unit, with DC-coupled HBD-DC 410 and HBD-DC 5000 models for solar-plus-storage plants.
Systems operate from -20°C to +55°C and up to 3,000 m altitude, and support on-grid and off-grid switching, external PV inverter and ATS integration and remote monitoring through the EMS, so the same platform suits factories, logistics centres, commercial buildings and hybrid industrial sites.
Table 1. MPMC HBD-A Series for C&I projects
|
Model |
Rated AC power |
Capacity |
Typical C&I application |
|
HBD-125-260 |
125 kW |
261 kWh |
Retail, hotels, small factories |
|
HBD-210-410 |
210 kW |
418 kWh |
Medium factories; 690-800 V connection |
|
HBD-250-1000 |
250 kW |
1,045 kWh |
Longer-duration peak shaving and solar shifting |
|
HBD-500-1000 |
500 kW |
1,045 kWh |
Industrial peak shaving and hybrid sites |
|
HBD-1000-2000 |
1,125 kW |
2,170 kWh |
Large industrial and grid-service plants |
Capability 3: Self-Developed Control Software
MPMC's own EMS and SCADA coordinate PV forecasting, battery scheduling and load response, and support PQ, VF, VSG, black start and grid-forming modes. The SCADA platform provides real-time remote monitoring and control, alarm management, maintenance work orders and automated monthly and annual reports, stores ten years of data, runs on an SL3-level cybersecurity framework and uses Starlink satellite communication as a backup link. Open protocols allow integration with a site's existing energy management systems.
Capability 4: Documented Project Experience
Large-Scale Storage Across Europe and Beyond
MPMC's BESS references span frequency regulation, peak shaving and hybrid industrial power, with several multi-megawatt-hour systems in Europe.
The 8 MWh system delivered to Europe illustrates the build quality: each HBD-1000-2000A unit uses a dual-PCS parallel architecture with 45 CATL LFP battery packs in a full-weld 20HQ container with C4 coating, ceramic-based aerogel insulation, IP55 protection and aerosol fire suppression in every pack.

Two MPMC HBD-500-1000 battery energy storage systems installed outdoors at a project site.
Table 2. Selected MPMC BESS projects
|
Project |
Configuration |
Services |
|
Green power plant, Hungary (8 MWh) |
HBD-500-1000 x 2 + HBD-1000-2000 x 3 |
Frequency regulation, peak shaving, load balancing |
|
Grid-connected storage plant, Netherlands (8 MWh) |
HBD-A Series, 4 x 2 MWh |
Frequency regulation |
|
8 MWh BESS delivered to Europe |
5 x HBD-1000-2000A, 2,097 kWh each; CATL LFP packs |
Frequency regulation, peak shaving, load balancing |
|
Peak-shaving storage, Netherlands (3.2 MWh) |
125 kW/260 kWh and 100 kW/200 kWh units |
C&I peak shaving |
|
Off-grid concrete batching plant, Dubai (10 MWh) |
10 x HBD-500-1000 with gensets |
Hybrid power; around 20% OPEX reduction |
Capability 5: Warranty and Service Support
HBD-A and HBD-E systems carry a 5-year product warranty or 2.2 MWh per kWh of throughput and a 10-year battery performance warranty or 4.3 MWh per kWh, with at least 70% capacity retention. MPMC provides remote technical support and diagnostics through its SCADA/EMS cloud platform, on-site commissioning by MPMC service engineers for complex deployments and APP/Web monitoring for daily operation. As one of the few Chinese manufacturers supplying generator sets, BESS and BCH mobile chargers from its own factories, MPMC can also deliver storage, backup generation and EV charging under one shared EMS.
Next Steps for Your C&I Storage Project
• Share your load profile, tariff structure and solar plans
• Agree the project goals: peak shaving, self-consumption, backup or grid services
• Review the recommended HBD model and EMS strategy with MPMC engineers
• Plan commissioning and remote monitoring arrangements
• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a project proposal
https://www.mpmc-group.com/
MPMC Powertech Corp.
